SOP Configuration

SOP Configuration

In one of the implementations in my career we had to map the Sales and Operation Planning requirement of the company into SAP and give them the future projection. It was a Pharmaceutical company which had multiple Pharmacies across the country. Hence it was extremely important for them. We worked over the functionality so much in the test client that we remembered all the steps along with transaction codes by heart. The  following is a list of those Transaction codes along with Stepwise procedure which will help you in SOP functionality.  

The Structure MCVBRP is appended by ABAPer to include the required Key Figures used in the Planning table for the Client.

1-Field Catalog for Key Figures and Characteristics (MC19)

2-Create Info Structure (MC21) 

3-Update Info Structure ( OMO1) 

4-Set  Planning Parameters for Info Structure ( MC7F) 

5-Create Planning Type (MC8A ) 

6- Create Plan in Flexible Planning (MC93)

 
Master Data for SOP:


Create Planning Hierarchy ( MC61 )
Revise Planning Hierarchy ( MC59)








No comments:

Post a Comment